Photovoltaic power generation is simple from now on
Distributed Power Station Scheme Process
Household distributed
Smart Energy Platform
Mobile phone monitoring
Standard scheme
5- 50kW
4G/WiFi wireless communication module
Smart Energy Management Platform
Internet mode
Full Internet Access
Self-use, surplus electricity online
Components
DC
household inverter
Communication
Photovoltaic grid-connected box
Communication
Power Grid
Grid-connected voltage level
0.4KV
10KV
35KV
Internet mode
Full Internet Access
Self-use, surplus electricity online
Distributed industry and commerce
Communication
0
Mobile phone monitoring
Small Power Station Big Wisdom
Distributed Power Station Scheme Process
Prophase of the project
Professional design team in the industry
Rich experience in photovoltaic energy project design Customize different design schemes
Roof Environment
consumption situation
Electricity consumption
building structure
Surrounding environment
Ensure the safety and reliability of the power station
Comprehensive consideration of structure, fire prevention, waterproof, electric shock prevention and other issues
Structure
Check of bearing capacity of plant
Factory Design Institute Review
Guaranteed structural bearing capacity
Fire Prevention
Complete fire fighting equipment and measures
Set up a video surveillance system
Covering the whole area of the power station
Waterproof
Planning equipment storage areas
Planning secondary handling sequence
Strict supervision of construction operations
Anti-electric shock
Setting Electrical Safety Spacing
Improve inverter protection standard
Ensure the reliability of anti-island
Adopt a better layout design scheme
Increase the power generation of the entire power station5%Above
Pain points/difficulties |
Pain point resolution |
|---|---|
High energy consumption, high electricity bills, and idle rooftop resources |
Realizing Value of Photovoltaic Activation of Roof Resources |
The east-west orientation of the house cannot guarantee power generation |
Taking into account all factors, the design adopts a more optimal inclination angle |
There are many and irregularly arranged fans on the roof |
Ensuring aesthetics and avoiding shadow occlusion issues |
Taking a power station in Jiangsu as an example
Guarantee station 0 Defects
Improve the supply chain system to shorten the equipment delivery cycle.
Stock sharing
Supply chain sharing inventory ensures timely supply and reduces secondary inventory leading to increased costs.
Emergency procurement channel
Customers are in urgent need of materials, opening a fast track to ensure the progress of the project as scheduled..
Project responsibility system
The project specialist is responsible for controlling the progress of the project and ensuring that the procurement process is more effective.
Optimized layout design scheme
25 standard construction procedures
25 standard construction procedures
25 standard construction procedures
Ensure the quality and safety of power station
7 days after completion of construction and delivery
Detect 7-day power generation data
Securing revenue from power generation
0 Defects
Strict construction quality
Ensure the quality of the project
Strict engineering quality
Perfect construction quality inspection system
Equipment Arrival
Bracket installation
Array arrangement
Cable laying
Electrical installation
Self-inspection of the construction party
Project Department self-inspection
Acceptance by Quality Department
Acceptance by the Supervisor
Acceptance by the Owner
Sound response mechanism
Resolve customer issues in a timely and effective manner
1 hour
Quality after-sales response
Construction process response
Power station operation and maintenance response
Process response within an hour
3 hours
Equipment quality problems
Sudden accident of power station
Human operation fault
Emergency stop loss within three hours
24 hours
Equipment quality problems
Sudden accident of power station
Natural disaster failure
Be there within 24 hours.
All-weather operation and maintenance intelligent monitoring platform
Real-time monitoring of power station operation
Multi-level operation and maintenance monitoring
Simultaneous monitoring of 100 photovoltaic power
plants
Issued power station data monitoring report
Company, power station, mobile phone
Three-level monitoring real-time sharing
UAV inspection
1MW power station inspection comparison
Manual
More than 2 days
Drone
10min
Robot cleaning
0 Capital investment to increase power generation
Manual
7 days
Robot
10min
Complete certification qualification to ensure the safety and reliability of the project
Its qualification certificate
Business License
Work safety license
Engineering Design Qualification Certificate
Installation (repair, test) power construction permit
Construction Enterprise Qualification Certificate
China Energy Conservation Product Certification
Solar Product Certification
Enterprise Credit Rating Certificate
Yangzhou Yangda New Energy Co., Ltd.
Address: Songqiao Industrial Zone, North Suburb of Yangzhou, Jiangsu, China
Domestic business-PV division:0086-514-84241968,
13773441912(Manager Hao)
Overseas Business-Photovoltaic Business Department:0086-514-84228968
Mailbox:kevin@yangdelights.com
Copyright: Yangzhou Yangda New Energy Co., Ltd